fbpx Skip to content
Our Catalog Continues to Grow! Check back often.

Cold Frame Installation Instructions

Single Product

Cold Frame Installation Instructions

Cold Frame Installation Instructions

in Cold Frames

 

1. Place legs 2′ underground.

2. Arch fits into pre-drilled leg, drill through arch, add screw.

3. Swedge fits into drilled end to form purlin, drill & add screw for extra support.

4. Attach purlins under arches using U-bolts.

  • After placing arches in legs, add purlins under arches using U-bolts.
  • Add 3 purlins for 30′ arches, 1 purlin for 20′ arches.
  • On outside add rolled edge across top and bottom of legs.
  • On the rolled edge attach wire lock base.
  • Attach wire lock across end arches, knee-braces optional.

Click on ‘Download the product list’ tab for pdf of assembly instructions.

 

Contact us today to place an order.

Quarterly Newsletter

Join our Email list

Product Catalog

Download Catalogue